ExxonMobil Liza Phase 1 – Saipem Pipe offload

DPI, Guyana, Sunday, January 20, 2019

Saipem, ExxonMobil Guyana’s prime contractor for subsea installation services, offloaded its second shipment of 2684 pipes for the Liza Phase One project.  The pipe arrived in Georgetown on January 14th and is the second of multiple shipments adding to the 1519 pieces of pipe received in December.

The delivery consists of oil production flow-lines and gas and water reinjection pipes. These pipes will be laid on the seafloor at the Liza Phase One Development, offshore Guyana.

The pipes will be stored in Georgetown before being taken offshore in the second quarter of 2019 to be installed by the Saipem FDS2 pipe laying vessel.

CATEGORIES
TAGS

COVID-19 Alert!

Coronavirus disease spreads primarily through contact with an infected person when they cough or sneeze. It also spreads when a person touches a surface or object that has the virus on it, then touches their eyes, nose, or mouth. We urge citizens to practice good hygiene and social or physical distancing also adhere to the guidelines provided by the Ministry of Health, Guyana.